Management Model Presenting for the Continuation of Activities and Services After the Crisis (Case Study: The Headquarters of Tehran Water and Wastewater Company District 3)

Document Type : Research Paper

Authors

1 Department of Environmental Engineering, School of Environment, College of Engineering, University of Tehran, Tehran, Iran

2 Department of Crisis Management, Research Institute of Shakhes Pajouh, Isfahan, Iran

Abstract

Introduction
Water and residue companies, both urban and rural, are legally responsible for providing adequate safe drinking water. Disruption of water quality and its distribution can be caused by emergencies such as natural disasters, distress, and deliberate actions. Any disruption in quality and access to safe drinking water after a natural disaster can cause widespread disruption in the city and add to problems during a crisis; Therefore, the continuation of the activities and services of this unit during a natural disaster such as an earthquake can help a lot in crisis management and increase the flexibility of the city and cause the rapid return of the city to its normal state.
The Business Continuity Plan strives to provide the organization with the appropriate response and timely response to the crisis to bring the organization to a level of readiness that can provide services to its customers in the shortest possible time and based on pre-defined plans. Resume and, at best, go through the transition from a critical situation to a normal one. Proper implementation of this plan, while creating the ability to react and respond appropriately to crises and reduce the time to return to normal, can achieve various achievements such as expanding the preventive approach instead of passive in the face of crisis, reducing insurance costs, creating a sense of trust and reliability. Provide customers, users, and related organizations and significantly reduce the direct and indirect costs of a crisis.
One of the most important factors in increasing or decreasing the amount of damage and the number of human losses during natural disasters is the presence or absence of a crisis management system. One of the methods that can be used to prepare and compile crisis management and planning principles, and recently used in books written on crisis management, is to use the comprehensive process of crisis management and its phases to classify and present principles. In this model, crisis management principles are divided into four phases (prevention and reduction of effects, preparedness, coping, recovery), which include both planning and management.
Matherials & Methods
In this study, library studies, reference to relevant organizations and field visits, and interviews with experts on urban issues and crisis management have been used. analysis hierarchical process (AHP) has also been used for the required analyzes. First, the general framework of the extraction plan has been extracted using library studies and the use of international experience in the field of post-disaster Business Continuity Plan Then, questionnaires were designed to fill this sample and localize it for the headquarters of Water and Wastewater Company District 3 of Tehran. After compilation, these questionnaires were distributed among experts active in the field of crisis management, water, and wastewater in the city of Tehran's District 3. In the first part of this questionnaire, the necessary measures to continue the activities before, during, and after the accident in the headquarters area of Tehran Water and Wastewater Company District 3 have been questioned. After collecting the questionnaires, this part of the questionnaire was analyzed through SPSS19 software and a two-sentence test. The output of this test is included in the Business Continuity Plan. In the second part of the questionnaire, through the hierarchical structure, the person in charge of accident management and management in the company, as well as alternative sites for the continuation of the company's activities and services after the accident, were questioned. Experts have rated the questionnaires based on the AHP principles. Finally, using the Expert Choice 11 software and analyzing the data given by the experts, the options that have the highest score for this question have been identified. The use of qualitative and quantitative criteria, as well as the ability to adapt to judgments, are features that determine the AHP method to determine the coefficient of the importance of the parameters used in the research, to identify and select a suitable alternative site and project command to continue ABFA headquarters activities after the Earthquakes show. The first step in the hierarchical analysis process is to create a hierarchical structure of the subject matter in which the goals, criteria, options, and relationships between them are demonstrated. The next steps in the hierarchical analysis process that will be used in this research are weight calculation (coefficient of importance) of criteria, calculation of weight (coefficient of importance) of options (different types of alternative sites and different people for project command responsibility) and finally, logical compatibility review of judgments.
Discussion of Results & Conclusions
In this study, a responsible organizational chart is presented. It’s necessary to take a series of measures in places and buildings that are important or have a higher level of vulnerability in terms of performance, to take the first steps to deal with, and respond in the same place in critical or emergencies. To determine the crisis command was experts evaluated the Business Continuity Plan approach, parameters such as the individual's organizational strength to command in times of crisis and better performance and efficiency in times of crisis. Scoring and prioritization were done using the AHP method. The results of this analysis, which were obtained by entering the requested information from 10 experts in the Expertchoice11 software, show that the head of Water and Wastewater Company District 3 of Tehran, has been selected as the best person to command the crisis from the experts' point of view.
The correct and appropriate response to a crisis in the organization requires a team to lead and support response and recovery operations. Team members must be selected from experienced and trained staff who are aware of their responsibilities. The number and scope of teams' activities can include command and control teams, which include a crisis management team and a response, continuity or recovery management team, and operational teams.
To select an alternative site for the continuation of Water and Wastewater Company District 3 of Tehran's organizational life. Parameters such as organizational policy, cost of equipment and maintenance, earthquake vulnerability, and maximum allowable time for the company's inactivity were evaluated by experts and options based on AHP guidelines. They scored points against each other. These scores were then entered into the Expertchoice 11 software and analyzed. The obtained results showed that the experts gave the maximum score to the hot site, and the warm site is in second place. The first step in the Business Continuity Plan should include an organizational structure that often takes the form of a committee that ensures the executive guarantee of senior executives and defines the role of senior executives and their responsibilities after studying and review the BS-25999 standard. And the localization of this standard, based on the organizational criteria of the Water and Wastewater Company, led to the introduction of a committee to continue activities and services before the crisis and a responsible organizational chart at the time of the crisis.
Predicting and determining an alternative site to continue the company's activities after the crisis is an important issue in the Business Continuity Plan. Among the options and according to the appropriate criteria, as well as questions from relevant experts and scoring based on AHP principles and analysis and analysis of the results of the questionnaire with the software Expertchoice 11, the hot site was selected as the best site to continue the activities and services of Tehran Water and Wastewater Company District 3. A hot site is a well-equipped and multi-purpose site that also has staff at the time before the accident. This site can be activated in the shortest time after the accident, and in the time before the accident, administrative activities can be performed in it. For the continuity plan to always be up-to-date and scalable, it must be continuously tested and revised, as provided in the 2-year timeframe for this issue.

Keywords


آژانس همکاری‌های بین‌المللی ژاپن (جایکا). (1380). گزارش نهایی پروژه پهنه‌بندی لرزه‌ای تهران بزرگ. مرکز مطالعات زلزله و زیست‌محیطی تهران بزرگ
اسدی، ع (1370). بحران شناسی و جامعه‌شناسی بحران. تهران: فصلنامه دانشنامه، شماره 3.
اصغر پور، محمد جواد (1387). تصمیم‌گیری‌های چند معیاره. انتشارات دانشگاه تهران، چاپ ششم.
امیدوار، بابک و همکاران. (1389). اندرکنش بین شریان‌های حیاتی: چالش‌های اساسی و روش‌های مدلسازی. کنفرانس بین‌المللی مقاوم‌سازی لرزه‌ای. تهران، دانشگاه تهران.
آیین‌نامه اجرایی قانون تشکیل سازمان مدیریت بحران کشور. (1388). تهران: مجلس شورای اسلامی.
بایزیدی، ابراهیم. (1391). تحلیل داده‌های پرسشنامه‌ای به کمکspss. تهران: عابد.
بحرینی، حسین. (1378). نقش فرم، الگو و اندازه سکونت‌گاه‌ها در کاهش خطرات ناشی از وقوع زلزله. تهران: مرکز مقابله با سوانح طبیعی ایران
بیرودیان، نادر. (1385). مدیریت بحران، اصول ایمنی در حوادث غیرمنتظره. انتشارات جهاد دانشگاهی مشهد.
تسلیمی، حمیدرضا و تجلی، عباس. (1388). مدیریت بحران در تصفیه‌خانه‌های آب هنگام بروز حوادث غیرمترقبه. اولین جشنواره پژوهشی و فناوری صنعت آب و فاضلاب تهران.
تیموری،محمود. (1383).مدیرتبحراندربافتهایتاریخی،ضمیمهماهنامهشهرداریها،شماره 61 ،ویژهنامه شماره 1.
جعفری، حمیدرضا. (1387). مدیریت سوانح. تهران: انتشارات دانشگاه تهران.
حافظ نیا، م. (1389). مقدمه‌ای بر روش تحقیق در علوم انسانی. سازمان مطالعه و تدوین کتب علوم انسانی دانشگاه‌ها (سمت)، مرکز تحقیق و توسعه علوم انسانی.
درابک، توماس. (1383).مدیریتبحران،اصولوراهنمایعملیبرایدولت‌های محلی.تهران: شرکتپردازشوبرنامه‌ریزیشهریوابستهبهشهرداریتهران.
درخشان فرد، مهدی. (1389).  تهیه طرح واکنش در شرایط اضطراری ناشی از وقوع زلزله، مطالعه موردی کمپ انسانی شرکت نفت وگاز پارس در عسلویه.اساتید راهنما: دکتر صالحی،دکتر مثنوی.دانشکده محیط‌زیست دانشگاه تهران.
رضایی، کامران؛ ارزنده، علیرضا. (1386). واکنش در شرایط اضطرار و مدیریت بحران
رضائیان، ع. (1387). مبانی سازمان و مدیریت. تهران، سازمان مطالعه و تدوین کتب علوم انسانی دانشگاه‌ها (سمت).
زبردست، ا. (1380). کاربرد فرایند تحلیل سلسله مراتبی در برنامه‌ریزی شهری و منطقه‌ای. نشریه هنرهای زیبا.
شریف واقفی، سید حمیدرضا. (1389). برنامه‌ریزی اضطراری برای تأسیسات آب و فاضلاب. تهران، انتشارات آوای قلم.
عزیزی، م. (1389). استاندارد مدیریت تداوم کسب و کار Bs-25999.
علمداری، شهرام. (1384). جامعه آماده (1). تهران: نواندیشان آریا کهن.
غفوری، محسن. (1380). کاهش خطرپذیری لرزه‌ای شهر تهران. تهران: مرکز مطالعات مقابله با سوانح طبیعی ایران.
گیوه چی، سعید. (1389). برنامه‌ریزی شهری به‌منظور پیشگیری وکاهش اثر سوانح. تهران: موسسه آموزش عالی علمی- کاربردی هلال ایران.
مشهدی، دکتر حسن. (1388). مهندسی بحران و تضمین تداوم حیات سازمانی. نشریه حمل و نقل و توسعه.
ناطقی الهی، فریبرز. (1379). مدیریت بحران زمین‌لرزۀ ابر شهرها با رویکرد به برنامۀ مدیریت بحران زمین‌لرزۀ شهر تهران، تهران: انتشارات پژوهشکده بین‌المللی زلزله‌شناسی و مهندسی زلزله، 229 صفحه، شابک: x-14-6490-964
نیکمردان، علی. (1391). معرفی نرم‌افزار Expert Choice 11. تهران: جهاد دانشگاهی واحد صنعتی امیرکبیر.
Alexander, D.E. (2003) Towards the Development of Standards in Emergency Management Training and Education. Disaster Prevention and Management 12 (2): 113–23.
Asgary Ali, 2006, “Theorizing Disaster and Emergency Management” in “Tsunami and Disaster Management: Law and Governance” edited by C. Raj Kumar and D.K. Srivastava, Thomson, Hong Kong.
British Standards Institution(2006). Business Continuity Management-part1: Code of practice. BSI.
British Standards Institution(2007). Business Continuity Management- Part2:Specification.
Carter, W. N. (1991). Disaster Management: A Disaster Manager’s Handbook. Manila: Asian Development Bank.
Coppola D. P., (2007), “Introduction to International Disaster Management”, Elsevier.
FEMA, 2010. "Developing and Maintaining Emergency Operations Plans". (Comprehensive Preparedness Guide (CPG) 101 Version 2.0). Washington, D.C.: Federal Emergency Management Agency (FEMA).
Grigg, N. s. (2000). Risk management in water utilities.Available: http://www.engr.colostate.edu/ce/outreach/conferences/disasters/Risk_working_paper_4.doc.
Joseph F.Gustin. (2010). Disaster & Recovery Planning: A Guide for Facility Managers.
Lindell, M.K, 1995."Assessing emergency facility risk analyses: Preparedness in support of hazardous Application to siting a US hazardous waste in cinerator", Journal of Hazardous Materials, 40, pp.297-319.
Public Safety Canada. (2012). A guide to business continuity planning.
Quarantelli, E. L., (1994), “Twenty Criteria For Evaluating Disaster Planning And Managing And Their Applicability In Developing Societies”, Disaster Research Center,
Standard Checklist Criteria for Business Recovery. Retrieved from Federal Emergency Management Agency (FEMA).